Main
—
Референс лист основных проектов 2014-2018
1 april 2011
Automated operative-dispatch control system (MES-system) for cellulose production.
14 march 2011
Electric part of regulating and protecting system for turbine Tp-100/110-8.8
11 march 2011
Rakurs product at ‘The Best Innovative Project’ competition
4 march 2011
Gissarakskaya HPP hydro-units have produced the first electricity for the network
21 february 2011
LMZ has tested the equipment for Boguchanskaya HPP
18 february 2011
The equipment of the control system for hydroelectric unit No.1 has been shipped to Zagorskaya PSHPP
28 January 2011
Control Systems for Turbogenerators have been put into operation at Chelyabinsk Power Plant No.3
12 January 2011
VibroSystM Production were certificated in Russia.
3 December 2010
Startup of hydroelectric unit at Kambaratinskaya HPP-2 in Kyrgyzstan
1 December 2010
SPC “Rakurs” is the winner of “100 Russia’s best products”contest
30 November 2010
Scientific-Production Company (SPC) “Rakurs” at the I International Forum RE.SOURCE: Energy Conservation and Renewable Energy
19 November 2010
Start of building the Scientific and Technical Center “Rakurs Engineering "
15 October 2010
The equipment of Сontrol Systems were shipped to the Ust-Kamenogorsk hydropower plant (HPP).
7 September 2010
Remote control of hydroelectric unit was tested on Volkhovskaya HPP
30 August 2010
SPC Rakurs congratulated Arkhangelsk PPM on its 70-th Anniversary
16 August 2010
Control system for Kambaratinskaya HPP-2
12 August 2010
SPC "Rakurs" as a member of non-commercial partnership "Hydropower engineering of Russia"
10 August 2010
Modernization of the papermachine on "Paper-mill "Communar" is finished